Patios of Zaragoza
Sustainability
Innovation in e-distribución
What does the project involve?
With the Patios de Zaragoza project, at e‑distribución we want to improve the low-voltage electrical infrastructure to guarantee safety and supply quality for residents.
At the same time, we carry out the works as sustainably as possible and with the involvement of the local community.
Where is it taking place?
The project is being rolled out in a block in Zaragoza's central district, consisting of six residential communities.
It affects buildings located on the following streets:
- Pedro María Ric
- San Vicente Mártir
- Paseo de las Damas
- León XIII
Project phases
The project is divided into three phases, which are carried out progressively:
1. Exterior works
- Trenches will be opened on the pavements of the affected streets.
- Seven new underground networks will be built.
- General protection boxes (CGPs) will be installed on the facades.
- e‑distribución will carry out this phase, which will last approximately 6 weeks.
2. Internal connections
- Once the CGPs are installed, each community will connect its building to the new system.
- These works will be carried out by the installation company hired by each community.
- The approximate duration is 1 to 4 weeks, depending on the building's characteristics.
3. Removal of old internal networks
- When all building entrances are connected, the old cables and elements will be removed from the interior courtyards.
- e‑distribución will carry out the works with the consent of the communities.
- Some works will be done at height, using specialist companies.
- The approximate duration is 4 weeks.
Benefits for residents
This project brings clear improvements to the buildings and their residents:
- Safety
Renewal of an installation that is over 50 years old, reducing the risk of accidents. - Compliance with regulations
Adaptation to current electrical regulations and technology, facilitating future capacity increases and avoiding issues with insurance companies. - Better maintenance
The new network provides access to the installation for proper operation and maintenance. - Improved supply quality
Installation of general protection boxes, which were previously non-existent. - Property appreciation
Improved visual appearance of the courtyards and an increase in building value.
Contact
If you have any questions or queries about the project, we have provided residents with the following email address:
sostenibilidad_csv@enel.com